(Closed)The HCC system will be temporally stopped for a scheduled blackout of Cybermedia Center Toyonaka (Sep 17-18)
Please note that the HCC system will be temporally stopped for a scheduled blackout of Cybermedia Center Toyonaka.
Date : September 17th 4:00 p.m. - 18th 8:00 p.m.
- The following service will be stopped. Please note that you can't run and submit jobs.
・HCC (Jobclass "DBG-single")
- Please note that the job will not run, if you specified a time exceeded 4:00 p.m., September 17 for "elapstim_req".
- The following system will service normally.
HCC(besides Jobclass "DBG-single"),
SX-ACE(dedicated and shared use), VCC(dedicated and shared use), Application(license server)
Frontend server, Login server, Storage service
Shibboleth server
Thank you for your understanding.
Posted : September 06,2017